1. Select "True" for the Points in Range under the ElumTools Settings for the Create Schedule dialog to automatically select them. 
  2. Edit Points after running calculation and input Range Minimum and Range Maximum under the Statistics drop down menu.  
  3. Create Schedule without the Points in Range selected.                                      
  4. Add General Use Points in Range for the specific metric under the Schedule Properties.